Post-disaster Reconstruction after Typhoon Doksuri
August 2023: post-disaster reconstruction work after Typhoon Doksuri.

Project Cases
Deep road cleaning was carried out in Putian. After cleaning, the stone particles in the asphalt surface were clearly visible, and muddy and grimy roads regained the original color of freshly laid pavement. The cleaning was spill-free, avoiding the secondary pollution of vehicles caused by ordinary water sprinkling and sweeping. The project cleaned more than 1.2 million square meters of road surface, leaving the roads very clean.
Project Cases

August 2023: post-disaster reconstruction work after Typhoon Doksuri.

In September 2022, road pollution removal was carried out on the stockyard roads at the Port of Putian, improving air quality at and around the port and meeting the port’s environmental acceptance criteria.

Starting on July 20, 2021, Henan Province was hit by extreme rainfall that was long-lasting, widespread, massive in volume and intense. Daily rainfall at multiple national-level weather stations in the province exceeded the highest values since meteorological records began, and Henan suffered extremely severe damage. After the rainstorm, roads in many cities across Henan Province were heavily covered with accumulated dirt, severely affecting traffic and hindering the recovery of work and daily life for residents of the disaster areas.
Contact Us
Whether it’s deep cleaning of municipal roads, underground utility construction or emergency flood drainage and rescue, Hi-Shan will tailor an exclusive operation plan and a long-term maintenance program for you.